SCENARIO
OF POWER SYSTEM BEFORE THE SETUP OF LOAD DESPATCH CENTRES
•
Low voltage, low frequency.
•
Frequent Grid
failures.
•
Non
optimum utilization of available resources.
•
No
real time availability of data/ events occurring.
•
Inefficient
Power System Operation & Load Management
•
Wide
gap in Demand - Supply position (no regulation).
•
Low
voltages at Consumer end.
